This project includes the construction of the West Bridge Road - a new arterial road for foot and horse traffic that will connect the Downtown, Suburb, and Cliff Districts along an east-west route; and the West Bridge - a bridge structure spanning across the ocean west of the spawn island and terminating at the base of player HikikoMitchi. Along with this construction will be the construction of a manmade island to facilitate a bridge landing, in order to allow the West Bridge to change angle feasibly and realistically.
Phase 1 construction includes the terraforming of land surrounding the corridor for a smooth grade towards the bridge, grading and dirt work in preparation for paving, retaining wall construction where the bridge begins, as well as mushroom tree removal and small cave filling.
Phase 2 construction includes two subphases of construction:
West Bridge Road will be fully operational once this phase is complete.
Phase 3 construction involves the installment of lighting along the West Bridge Road corridor.
Phase 4 construction involves landscaping and tree-planting along the Downtown portion of the corridor.
Phase 5 construction consists of the construction, vegetation, terraforming, and grading of the artificial island just east of player HikikoMitchi's base.
Phase 6 construction consists of the assembly of the bridge deck, and any associated temporary supports.
Phase 7 construction involves the construction of the permanent bridge supports and paving of the bridge, as well as removal of any associated temporary supports.
Phase 8 construction involves the assembly of the small bridge deck connecting the artificial island and player HikikoMitchi's base, as well as erecting any associated temporary supports.
Phase 9 construction involves the assembly of permanent bridge supports on the smaller bridge as well as the removal of any temporary bridge supports.
Phase 10 construction involves the pavement and installation of polished diorite stair curbs throughout the West Bridge Road corridor between the West Bridge and the small connecting bridge. After this phase, the entire West Bridge Road corridor, including both bridges, will be fully operational.
Phase 11 construction involves the installation of lighting devices along the West Bridge Road corridor between the east side of the West Bridge and the west side of the small connecting bridge. After this phase, the project will be complete.
Status: In Progress
Status: Incomplete
Status: Incomplete
Status: Incomplete
Status: Incomplete
Status: Incomplete
Status: Incomplete
Status: Incomplete
Status: Incomplete
Status: Incomplete
Status: Incomplete
Nightshade SMP Department of Transportation
Copyright © 2022 Nightshade SMP Department of Transportation - All Rights Reserved.
Powered by GoDaddy
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.